(713) 447-7410 Mon - Fri 07:00 AM. - 5:00 PM. 22503 Katy Freeway Katy, Texas 77450

Custom

Dock Access

The Carr dock is located on the Ohio River at mile marker 166.25, on the left bank of the river, with convenient trucking access to Interstate 77 as well as local rail stations. We can also provide bulk hauling services.

Facilities include:

  • 50 ton crane on-site
  • Larger capacity cranes available
  • Conveyor system
  • Outdoor storage
  • Truck scale on-site

Box Lunch Program

  • Precast Concrete Solutions: Bridge Design #PSC07(a) 1.0 Learning Unit [HSW&SU]
  • Precast Concrete Preassembled Building #SPCPB 1.0 Learning Unit [HSW&SU]

Call for details to schedule a program.

Fulton Road Bridge
Cleveland, Ohio

Contractor: Kokosing Construction Company, Inc / Fru-Con Construction Corporation

Precast post-tensioned arch segments used in the replacement of the historic Fulton Road Bridge. Project design utilizing three arch segments forming one complete arch with four arches per span, to a total of 72 pieces. Pieces weighed approximately 75 tons.

 

US Army Corps of Engineers

Marmet Locks & Dam, Kanawha River, WV 
Contractor: Kokosing Construction Company, Inc.

Multi-year project to replace a lock and dam. Consisting of a three story precast architectural operations building, two precast concrete hydraulic buildings and 24 precast post-tensioned guide wall beams, each weighing 500 tons.

 

Request A Quote!